The Craft
Every anchor, pole and tension line is set and checked by our own crew, on every installation. No rigging is subcontracted out.
The team at work in the Cape
High-elevation wall anchor drilling, telescopic mast hoisting, perimeter tensioning and a final structural inspection before every handover.
- Mechanical anchoring: rotary hammer drilling for expansion sleeves at height
- Tension vectoring: perimeter straps secured to the central mast
- Upright placement: two-person synchronised pole hoisting for even interior headroom
- Hardware calibration: masonry anchor sleeves set and checked by hand
- Wall anchoring: perimeter tie-downs against wind shear
- Final inspection: every anchor line checked before the tent is handed over
See the conditions we plan for on Engineered for the Cape, or view more of the work in our gallery.